| ODM-01 | F1 | Design-stage defect capture | Security flaws are found where they are cheapest to fix - at design, not in production. | Security design defects identified at or before the Design gate as a percentage of all security design defects found in the period (including post-deployment escapes). | KPI | % | Higher | 80 | 65 | 65 | SSA | CIO / Portfolio Board | Quarterly | CI-03, CI-05, CI-07 | Design review tooling; defect tracker; incident RCA records | ESA-01, ESA-02, ESA-10, SSA-02, SSA-03, SSA-05, SSA-12 |
| ODM-02 | F1 | Security rework cost | Redesign cost avoided - the catalogue claim made measurable. | Effort/cost of post-build change attributable to security design decisions, as a percentage of total delivery spend on in-scope initiatives. | KRI | % | Lower | 2 | 4 | 4 | ESA | CFO / Portfolio Board | Quarterly | CI-04, CI-05 | Delivery tooling (change records); financial system cost codes | ESA-01, ESA-10, SSA-01, SSA-05 |
| ODM-03 | F1 | Pattern adoption & conformance | The estate converges on approved patterns; drift is caught quickly. | Percentage of new deployments conformant with the approved reference pattern that specifies them; drift detected within 30 days via configuration compliance scanning. | KCI | % | Higher | 85 | 70 | 70 | OSA | Domain / Platform Owners | Monthly | CI-06, CI-08 | Architecture repository; configuration compliance scanning; CMDB | ESA-02, ESA-15, ESA-22, ESA-23, SSA-06, OSA-06 |
| ODM-04 | F2 | Requirements traceability integrity | What we required is what was built and verified. | Percentage of Tier-1 changes whose security requirements trace to implemented and verified controls at go-live (requirement → control → verification evidence). | KCI | % | Higher | 95 | 85 | 85 | SSA | Change / Programme Boards | Quarterly | CI-02, CI-07 | Requirements repository; test evidence; architecture repository | ESA-03, SSA-04 |
| ODM-05 | F2 | Third-party assurance coverage | Supply chain exposure is within appetite. | Percentage of critical suppliers holding current security assurance within agreed threshold (assessment age, score, remediation status); high-tier suppliers reported alongside. | KRI | % | Higher | 100 | 90 | 90 | ESA | CPO / Supplier Board | Quarterly | CI-01, CI-09 | Supplier assurance platform; contract register | ESA-06, ESA-11, SSA-14 |
| ODM-06 | F2 | Procurement security cycle time | Security does not slow the buying process. | Median working days from procurement engagement to issue of security requirements for RFP/contract. | KPI | days | Lower | 10 | 15 | 15 | SSA | CPO / Procurement | Quarterly | CI-01 | Procurement workflow tooling | ESA-11, SSA-14 |
| ODM-07 | F3 | Regulatory trace completeness | Audit-ready by design, with an evidence chain. | Percentage of in-scope regulatory obligations (UK GDPR, NIS, ISO/IEC 27001 SoA) with a demonstrable obligation → control → architecture evidence chain. | KRI | % | Higher | 95 | 85 | 85 | ESA | CISO / Risk Committee | Quarterly | CI-02, CI-10 | GRC platform; control library; architecture repository | ESA-07, ESA-13, ESA-19, SSA-11, OSA-11 |
| ODM-08 | F3 | Audit findings attributable to design | Design quality shows up as clean audits. | Count of internal/external audit findings in the period whose root cause is an architecture or design defect (target: none critical). | KRI | count | Lower | 2 | 4 | 4 | ESA | CISO / Audit Committee | Annual | CI-10 | Audit findings register; RCA records | ESA-07, ESA-13, ESA-16, OSA-11 |
| ODM-09 | F3 | Standards currency | Standards keep pace with threat and technology change. | Percentage of technical security standards reviewed and reissued within their defined review cycle (12 or 24 months by class). | KCI | % | Higher | 90 | 75 | 75 | OSA | Design Authority | Quarterly | CI-08 | Standards register (architecture repository) | ESA-09 |
| ODM-10 | F4 | Control-objective coverage | Critical domains are demonstrably protected end-to-end. | Percentage of Tier-1 domain control objectives realised by at least one implemented, operating control/mechanism (SRM Conceptual → Logical → Physical trace), with gaps formally risk-accepted by the domain owner. | KRI | % | Higher | 95 | 85 | 85 | ESA | Domain Owners / Risk Committee | Quarterly | CI-02, CI-06 | Architecture repository; CMDB; control assurance results | ESA-04, ESA-05, OSA-01, OSA-07 |
| ODM-11 | F4 | Security debt exposure | Risk debt is bounded, visible and reducing. | Weighted index of open security technical-debt items and design exceptions on critical domains (severity × age); no exception older than 12 months without owner re-authorisation. | KRI | index | Lower | 100 | 130 | 130 | ESA | Risk Committee | Quarterly | CI-04, CI-11 | Exception register; technical debt inventory | ESA-14, ESA-23, SSA-16, OSA-05, OSA-15 |
| ODM-12 | F4 | Roadmap delivery | Security investment lands as planned capability. | Percentage of security capability roadmap milestones delivered within one quarter of plan. | KPI | % | Higher | 80 | 65 | 65 | SSA | CISO / Investment Board | Quarterly | CI-12 | Portfolio/programme tooling | ESA-05 |
| ODM-13 | F5 | Architectural lessons closed | Incidents make the architecture stronger. | Percentage of P1/P2 security incidents whose architectural lessons produce a published pattern or standard change within 90 days of incident closure. | KPI | % | Higher | 100 | 80 | 80 | SSA | CISO / Resilience Board | Quarterly | CI-13 | Incident records; standards/pattern register | ESA-12, SSA-17, OSA-18 |
| ODM-14 | F5 | Resilience design verification | Recovery works on paper and in practice. | Percentage of critical services whose recovery architecture has been exercised within 12 months and met agreed RTO/RPO. | KCI | % | Higher | 95 | 85 | 85 | OSA | Service Owners / Resilience Board | Quarterly | CI-14 | BC/DR test records; service catalogue | ESA-20, OSA-10 |
| ODM-15 | F6 | Early engagement rate | Teams come to security architecture by default, before build. | Percentage of in-scope (Tier-1) initiatives with security architecture engagement completed before build commences. | KPI | % | Higher | 90 | 75 | 75 | SSA | CIO / Delivery Leadership | Quarterly | CI-03, CI-15 | Delivery pipeline gates; engagement log | ESA-01, ESA-08, SSA-01, SSA-07 |
| ODM-16 | F6 | Capability uplift | Routine secure design becomes self-service. | Number of accredited secure-design practitioners in delivery teams and percentage of routine designs completed via self-served patterns without ESA escalation (composite, trend-based). | KPI | trend | Higher | 10 | 5 | 5 | ESA | CIO / HR (capability) | Annual | CI-15, CI-16 | Training records; pattern usage telemetry | ESA-18, ESA-21 |
| MP-01 | MP | Metric automation & data quality | The measurement system is trustworthy. | Percentage of ODMs generated automatically from operational data without manual adjustment; data-quality exceptions logged per cycle. | KCI | % | Higher | 80 | 60 | 60 | OSA | Design Authority | Quarterly | - | Metrics pipeline; data-quality checks | ESA-17, OSA-14 |
| MP-02 | MP | Decision uptake | Metrics change decisions, not just slides. | Percentage of architecture governance decisions (review boards, investment gates) whose records cite ODM evidence. | KPI | % | Higher | 70 | 50 | 50 | ESA | Design Authority | Quarterly | - | Governance minutes / decision log | ESA-16, ESA-17 |